The Powder Room
The original wall Mirror was taken down before I took pictures.
Entire Vanity structure demolished but the solid wood reclaimed to build the new vanity.
Layers over layers of Paint and Wall Paper, cracked walls to re-plaster.
Plumbing to redo, toilet to replace, Ceiling to take down, Electrical to redesign.
Entire Vanity structure demolished but the solid wood reclaimed to build the new vanity.
Layers over layers of Paint and Wall Paper, cracked walls to re-plaster.
Plumbing to redo, toilet to replace, Ceiling to take down, Electrical to redesign.
Walls repaired and primed.
New homemade Baseboards.
Rotten subfloor under vinyl tiles... so New plywood subfloor, cement boards.
New Toilet plumbing and cot & cold copper lines from the basement up.
New Wiring throughout.
New homemade Baseboards.
Rotten subfloor under vinyl tiles... so New plywood subfloor, cement boards.
New Toilet plumbing and cot & cold copper lines from the basement up.
New Wiring throughout.
Walls textured and painted.
Mirror found in a thrift store.
I made the wall Sconce with carved solid wood inserts from an antique door.
Entire Cabinet made with reclaimed solid wood.
Sink, Faucet, Towel hook and Chrome plumbing ordered online.
Ceiling made to match the Italian floor tiles.
New dual flush toilet, new vent.
The Ebony animal on the door holds the key to the loc.
Original glass Door knobs, plates, lock and key.
Mirror found in a thrift store.
I made the wall Sconce with carved solid wood inserts from an antique door.
Entire Cabinet made with reclaimed solid wood.
Sink, Faucet, Towel hook and Chrome plumbing ordered online.
Ceiling made to match the Italian floor tiles.
New dual flush toilet, new vent.
The Ebony animal on the door holds the key to the loc.
Original glass Door knobs, plates, lock and key.